Current Work:

  • Today morning we met to discuss the progress of our work. During the weekend we were going through the code base and then today morning we all went through the new design changes proposed by Team1.
  • Our conclusion so far is as follows;
    • If we can make the changes as per the new design change fairly quickly we can go ahead and implement them and then focus on an achievable goal like MP3 sorter, but if the changes require lot of work and probably consumes a semester then we have to decide whether to go ahead with changing design or fixing the bugs in the existing code base. May be we need to vote